Skokie Bike Infrastructure Improvements
Author Last Post
This is all terrific. I did not see anything about the bike lane on Crawford going most of the length of the village. I hope that is still on track.
Thanks for the update,
Earl

--

"Good is something you do, not something you talk about. Some medals are pinned to your soul, not to your jacket. 
Gino Bartali, Italian hero and winner of the Tour de France in 1938

    See my two new jewelry boxes.
Soccer coaches, refs, players, check out  Coaches Across Continents

Posted today on the Skokie website:

Posted on: June 6, 2023

Skokie Bike Infrastructure Improvements

Old OrchardMulti-use Patch At Beverly

Love to bike around Skokie? Several exciting projects are planned over the next three years to further enhance the Village’s network of bike routes, lanes and multi-use paths.

Read a summary of planned 2023-25 bike infrastructure projects below, view the Bikeway System Plan, and explore an interactive map of active and proposed bikeways.

2023 Improvements

Gross Point and Grant Proposed improvements

New bikes lanes on Gross Point Road (Golf to Old Orchard) – Beginning in mid-June, the Illinois Department of Transportation (IDOT) will begin a road reconstruction project on Gross Point Road, including adding new dedicated bike lanes on each side of the roadway. The project is expected to be substantially complete in late fall, with minor work remaining in 2024.


Old Orchard Harms Woods connection path

Connection of Old Orchard Multi-Use Path to North Branch Trail – The Village has completed a short pavement connection from the Old Orchard Multi-Use Path at Harms Road to the North Branch Trail System.


Old OrchardMulti-use Patch At Beverly

Extension of Old Orchard Multi-Use Path (East of Skokie Boulevard to Beverly Avenue) – The Village worked with Cook County to complete a short extension of the Old Orchard Multi-Use Path at Beverly Avenue east of Skokie Boulevard this spring.

2024 Improvements

Skokie Valley Trail At Dempster Street (photo by Google Maps)

Extension of the Skokie Valley Trail (Dempster to Golf) – The Village will add more than a mile of multi-use pathway to the Skokie Valley Trail, completing a critical connection on this popular trail between Dempster Street and Golf Road. The project is currently in the design and land acquisition phase.

Skokie Valley Trail crossing improvements at Main Street/Niles Center Road – This project will create an improved bike and pedestrian crossing on the Skokie Valley Trail at Main Street and Niles Center Road, adding a marked crossing and median refuge.

Church Street bike lane highlighted map

New bikes lanes on Church Street (McCormick to Linder Avenues) – The Village will add on-street bike lanes on Church Street, creating another east to west bikeway across Skokie. The project will include widening the street in some locations and traffic signal modifications.

2025 Improvements

New bike lanes and roadway resurfacing on Oakton Street (McCormick to Kilpatrick) – This section of Oakton Street is owned and maintained by Cook County. The Village is in communication with the County on their roadway resurfacing project, which will include the addition of dedicated bike lanes. This project is currently in the planning phase.

Construction of Old Orchard Multi-Use Path (Skokie Boulevard to Skokie Valley Trail at Lockwood) – This project will complete the connection of the Old Orchard Multi-Use Path from Gross Point Road to the Skokie Valley Trail.

Extension of the Skokie Valley Trail (Old Orchard to north Village limits) – The Village is coordinating with northern Cook County municipalities to extend the Skokie Valley Trail to Lake County. To complete the connection in Skokie, the Village will be adding less than a mile of multi-use pathway from Old Orchard Road to the north Village limits. Once complete, the Skokie Valley Trail will span the Village from south to north.